Water Treatment

WISE Pump Station

Parker, CO

Constructing new pumping and flow control infrastructure.

Project Type

Water Treatment

Constructed Value
$15M
Delivery Method
DBB
Architect/Engineer
HDR / Owner: Parker Water & Sanitation District

The challenge

Developing the WISE Pump Station involved more than building a new pump station. The project also required chemical feed and storage systems to support treatment operations, along with a flow control vault that would regulate water entering the station. Bringing those elements together meant coordinating pumping, chemical and flow control infrastructure as part of one new facility.

Crane unloading large purple surge tank from flatbed truck at WISE Pump Station construction site
highlights

Vertical turbine pump station


Cast-in-place wet well


Chemical feed and storage systems

Challenge met

Filanc constructed the new vertical turbine pump station, including a cast-in-place wet well and the associated chemical feed and storage facilities for sodium hypochlorite, sodium hydroxide and liquid ammonium sulfate.

The project also included a cast-in-place flow control vault containing two electrically actuated plunger valves that feed the pump station. Together, these improvements provide the pumping and treatment support infrastructure needed for reliable system operation.

Recent Projects

Morrow Bay Water Treatment Facility

Morro Bay Water Reclamation Facility

Facility for Agriculture

MF/RO Facility for Agriculture

Santa Margarita Conjunctive Use Project Facilities