Constructing new pumping and flow control infrastructure.
Project Type
Water Treatment
Constructed Value
$15MDelivery Method
DBBArchitect/Engineer
HDR / Owner: Parker Water & Sanitation DistrictThe challenge
Developing the WISE Pump Station involved more than building a new pump station. The project also required chemical feed and storage systems to support treatment operations, along with a flow control vault that would regulate water entering the station. Bringing those elements together meant coordinating pumping, chemical and flow control infrastructure as part of one new facility.

highlights
Vertical turbine pump station
Cast-in-place wet well
Chemical feed and storage systems
Challenge met
Filanc constructed the new vertical turbine pump station, including a cast-in-place wet well and the associated chemical feed and storage facilities for sodium hypochlorite, sodium hydroxide and liquid ammonium sulfate.
The project also included a cast-in-place flow control vault containing two electrically actuated plunger valves that feed the pump station. Together, these improvements provide the pumping and treatment support infrastructure needed for reliable system operation.